ArcGIS REST Services Directory Login | Get Token
JSON

Legend (Public/Infrastructure)

TasWater Sewer Serviced Land (0)
Full Service Full Service
TasWater Water Serviced Land (1)
Full Service Full Service
TasWater Water Hydrant (2)
TasWater Sewer Maintenance Hole (3)
TasWater Water Main (4)
Bulk Transfer Main Bulk Transfer Main
Channel Channel
Distribution Main Distribution Main
Dummy Connector Dummy Connector
Overflow Pipe Overflow Pipe
Raw Water Main Raw Water Main
Reticulation Main Reticulation Main
Reticulation Sub-Main Reticulation Sub-Main
Scour Pipe Scour Pipe
Irrigation Line Irrigation Line
TasWater Sewer Main (5)
Gravity Trunk Main Gravity Trunk Main
Gravity Reticulation Main Gravity Reticulation Main
Overflow Pipe Overflow Pipe
Outfall Pipe Outfall Pipe
Siphon Siphon
Scour Pipe Scour Pipe
Vent Pipe Vent Pipe
Emergency Storage Pipe Emergency Storage Pipe
TasWater Flood Inundation Summary (6)
Community Sports and Recreation Facilities (8)
Bowls Bowls
Cricket Cricket
Croquet Croquet
Equestrian Equestrian
Football Football
Golf Golf
Gun and rifle Gun and rifle
Other sporting Other sporting
Rowing Rowing
Rugby Rugby
Soccer Soccer
Surf life saving Surf life saving
Tennis Tennis
Yacht and sailing Yacht and sailing
Sportsground Sportsground
Showground Showground
Park or reserve Park or reserve
Church hall Church hall
Community centre or town or city hall Community centre or town or city hall
Golf Golf
Hockey Hockey
Indoor general Indoor general
Netball Netball
Other Other
Racecourses Racecourses
Squash Squash
Swimming pools Swimming pools
TasWater Water Network Structures (9)
Treatment Plant Treatment Plant
Dosing Facility Dosing Facility
Break Pressure Tank
Break Pressure Tank
Dam - Storage
Dam - Storage
Pump Station Pump Station
Reservoir
Reservoir
Tank
Tank
TasWater Sewer Network Structures (10)
<all other values> <all other values>
Pump Station Pump Station
Treatment Plant Treatment Plant
TasWater Recycled Water Network Structures (11)
Pump Station Pump Station
Reservoir Reservoir
Tank Tank
TasWater Stormwater Network Structures (12)
TasWater Stormwater Maintenance Holes (13)
TasWater Sewer Pressurised Mains (14)
Pressure Reticulation Main Pressure Reticulation Main
Rising Main Rising Main
TasWater Recycled Water Mains (15)
Bulk Transfer Main Bulk Transfer Main
Distribution Main Distribution Main
Overflow Pipe Overflow Pipe
Raw Water Main Raw Water Main
Scour Pipe Scour Pipe
Dummy Connector Dummy Connector
TasWater Stormwater Gravity Mains (16)
Gravity Reticulation Main Gravity Reticulation Main
Subsoil Drainage Main Subsoil Drainage Main
TasWater Stormwater Pressurised Main (17)
General Access Bus Routes (18)
Metro Tasmania Metro Tasmania
Tassielink Tassielink
Kinetic Kinetic
Calow's Coaches Calow's Coaches
Manion's Coaches Manion's Coaches
Derwent Ferries Derwent Ferries
Department of State Growth Department of State Growth
General Access Bus Stops (19)
TasWater Sewer Lateral Line (20)
TasWater Water Lateral Line (21)
Tasmanian Irrigation - Hydro Power Station (24)
Tasmanian Irrigation - Pump Station (26)
Tasmanian Irrigation - Pipeline (28)
Tasmanian Irrigation - Tradezone (29)
Tasmanian Irrigation - Transmission Line (30)
Tasmanian Irrigation - Irrigation District (32)
Tasmanian Irrigation - Dam (35)
TasWater Water Intake (38)
<all other values> <all other values>
Bore Bore
Weir Weir
TasWater Drinking Water Catchment (37)
TasGas Distribution Pipe (41)
Distribution PE – 1000kPa and 500kPa Distribution PE – 1000kPa and 500kPa
Transmission Steel Transmission Steel
V Offtakes (42)
ACMA Communication Sites (43)
Site with Assignments Site with Assignments
Site with No Assignments Site with No Assignments
TasWater Water Customer Connection Point (44)
Unknown Connection Size Unknown Connection Size
<= 20mm Connection Size <= 20mm Connection Size
> 20mm - <= 50mm Connection Size > 20mm - <= 50mm Connection Size
> 50mm - <= 100mm Connection Size > 50mm - <= 100mm Connection Size
< 100mm Connection Size < 100mm Connection Size
Tas Gas Declared Gas Pipeline Planning Corridor (46)
Tasmanian Gas Pipeline Easement (48)
Gas Pipeline Planning Corridor (49)
EPA Underground Petroleum Storage Systems (51)
Active Active
Abandoned Abandoned
Decommissioning in Progress Decommissioning in Progress
Temporarily Decommissioned Temporarily Decommissioned
Permanently Decommissioned Permanently Decommissioned
Groundwater Bore Hole (52)
Constructed Constructed
Natural Natural
TasPorts - Vessel Traffic Service areas (57)
TasNetworks Tower Locations (59)
TasNetworks Substation Locations (60)
TasNetworks Transmission Lines (61)
TasNetworks Poles (62)
TasNetworks Low Voltage Conductors (63)
Low Voltage Service Low Voltage Service
Low Voltage Span Low Voltage Span
Low Voltage Underground Cable Low Voltage Underground Cable
TasNetworks High Voltage Conductors (64)
High Voltage Overhead Line High Voltage Overhead Line
High Voltage Underground Cable High Voltage Underground Cable
TasWater Sewer Abandoned Point (66)
TasWater Stormwater Abandoned Point (67)
TasWater Water Abandoned Point (68)
TasWater Sewer Abandoned Line (69)
TasWater Stormwater Abandoned Line (70)
TasWater Water Abandoned Line (71)